Products Description
The CYTJ76I is a fully automatic drilling intelligent hydraulic tunneling drilling jumbo for fast, accurate drilling in small to medium vein underground mining, tunneling and construction applications.
The system allows unmanned and fully automated drilling according to the layout plan.
Optimized for small and medium-sized tunnels and roadways, the maximum working face can be up to 6.1m wide and 6m high
DI4 control system and imported PLC control, the main control unit adopts imported embedded card computer, which makes the operation simpler and safer.
Self-developed HYG rock drill with double cushion can extend the service life of drill pipe and improve drilling efficiency.
The main components include Deutz diesel engine, Dana axle, ABB motor and Bosch Rexroth valve set, which make the machine more durable and reliable.
Fully intelligent drilling operation with high-precision sensors for efficient and repeatable operation.
With safety as the premise, speed as the core and stability as the guarantee, CYTJ76I Automatic hydraulic tunneling drilling jumbo significantly improves productivity by virtue of its precise and efficient operational performance.
Tramming Dimensions | 11200X1910X2100mm | Boom | 1 | Motor Model | ABB YX3 250M-4(B5) |
Roof Height | 2900 mm | Boom extension | 1250 mm | Power rating | 55 KW |
Ground clearance | 260 mm | Feed extension | 1250 mm | Power rating, air pump | ABB 5.5KW |
Tyres | 8.25XR15 | Feed roll-over | 360° | System pressure (main pump) | 180bar |
Fuel oil tank volume | 60 L | Lifting angle, max | +65° | Tramming pump power | 230 bar |
Hydraulic oil tank volume | 124 L | Lifting angle, min | -30° | Air supply / working pressure | 2~8 bar |
Front axle | DANA112 | Swinging angle | ±35° | Air supply / flow rate | 600 L/min(6bar) |
Rear axle | DANA112+311 | Coverage cross section | 36 ㎡ | Water supply / working pressure | 8~12 bar |
Hydrostatic power steering | ±40° | Hole Diameter | 45~76 mm | Water supply / flow rate | 80L/min(7bar) |
Drive | Four-wheel drive | Shank length | 3090~6135mm | Service brake | Two separate circuits |
Rear axle oscillation | ±10° | Rotary speed, hydraulic drilling machine | 0-230 r/min | Emergency&parking brake | SAHR |
Turning radius, min | (Inner)2800 mm | Shank lubrication | Oil-pressure air | Turning radius,min | (Outer)4900 mm |
Gradeability, max | 1:4 | Engine Model | DEUTZ F5L912W | Electrical Cable Size&Length | |
Tramming speed | 0~10 Km/h | Power rating | 52 KW | 380 V;4X30 mm²;80 m | |
Exhaust catalyser | Exhaust catalyze silencer | Rotating speed,max | 2300 rpm | 690 V;4X25 mm²;100 m | |
Gross weight | 11500 Kg | Torque, max | 258 N·m | 1000 V;3X25+3X6 mm²;145 m |